cameroon gce intermediate level material technology and workshop processes 3
cameroon gce intermediate level material technology and workshop processes 3
BENCH WORK
WORK REQUIRED:
Each candidate is required to use the provided material to produce the pivoting split washer of
as shown below.
Each candidate will be provided with:
âȘ Flat bar of 8mm thick 80 x 70mm
| BENCH WORK | ||
| 1 | Proper cutting | 05 |
| 2 | boring | 08 |
| 3 | Reaming | 04 |
| 4 | Proper filing | 05 |
| 5 | Finish (completion) | 08 |
| SUB TOTAL C | 30 | |
| Grand Total (A+B+C) | 100 |
