  1. The purpose of site investigation is to

    A Position the project on the site.

    B Gather information about the site.

    C Be able to build the site hutments.

    D Know where to start the project on

    site.

  2. Choose two aspects related to site

    investigation

    A Preliminary and finished

    investigation.

    B Supplementary and beginning

    investigation.

    C Detailed and planned investigation.

    D Preliminary and detailed

    investigation.

  3. Two principal systems used in drainage are

    A Storm and combine system.

    B Combined and separate system.

    C Isolated and combine system

    D Separate and isolated system

  4. The process of reducing or removing sap in

    wood is

    A Seasoning

    B Tarrying

    C Creosoting.

    D Painting.

  5. Strands in pre-stressing are

    A Star cables.

    B Tensioning rods.

    C Wires.

    D Tendons.

  6. Less prestressed due to relaxation of steel

    may be compensated by

    A Permanent over stressing

    B Sustained over stressing.

    C Normal over stressing.

    D Temporary over stressing.

  7. In walls, Cavity is space

    A At the top of two leafs

    B At the bottom of two leafs

    C Between two separating walls.

    D Between two leafs

  8. In counterfort retaining walls, the main

    reinforcement in the stem and at the

    supports are provided

    A Only in the inner face.

    B At the line of eccentricity.

    C Only in the front face.

    D Both in the inner and front faces.

  9. A panel wall is an

    A Internal non-load bearing wall.

    B External non-load bearing wall.

    C Internal load bearing wall.

    D External load bearing wall.

  10. A system whereby both soil and waste

    water are discharged into a single pipe

    through a trap is a

    A Sewer

    B Soil pipe

    C Stack

    D Soil drain

  11. The necessity to tie back the scaffold with

    the building at suitable levels is known as

    A Loading.

    B Raising.

    C Spacing.

    D Tying in.

  12. Ribbed floors are also known as

    A Hollow floors.

    B Pillar joists floors.

    C R.C.C. floors.

    D Solid tiled floors.

  13. Indicate the parts of electrical insulation

    system that does not have the potential of

    the earth after the earthing of a building

    A Switches

    B Fuses

    C Neutral

    D Live wire

  14. The importance of using twisted steel bars

    in reinforced concrete is to increase the

    A cost of steel

    B Key between steel and concrete.

    C Quantity of water in the concrete mix.

    D bar bonding capability.

 