1. A group of people working together towards a common goal and objective is
A. An organ
B. An organisation
C. An organisation
D. An organigram
2. State a place that embodies many industrial machines and workers for garment manufacture.
A. Tailoring workshop
B. Sewing workshop
C. Sewing factory
D. Manufacturing factory
3. One of the points to consider when establishing a business is
A. Observing trend
B. Solving a problem
C. Production of designed products
D. Scanning the environment
4. State one principle of good implantation.
A. Minimal congestion
B. Effective workers
C. List of models
D. Modify the building
5. In the evolution of work organisation, analysis has to do with
A. Arranging thoughts
B. Revising everything
C. Break down problem
D. Revise without emission
6. A manufacturer who is afraid to undertake an entrepreneurial venture lacks the ability of
A. innovation
B. organisation
C. risk bearing
D. motivation
7. Identify a factor necessary to establish an implantation rate
A. Work load time
B. Operation time
C. Pitch time
D. Speed time
8. Write the acronym SESA in full.
A. Standard Elements of Analysis
B. Standard Elements of Stitching Analysis
C. Standard Stitching analysis
D. Standard Elements Stitching
9. State the formula used to calculate reference time.
A. To=100∑t
B. TD=N×C∑t×Tp
C. To=100∑t×Tp
D. To=100∑t
10. Time spent by an operator to adjust a machine is known as
A. Unproductive working time
B. Wasted working time
C. Strange working time
D. Additional working time
11. The fabrication rake is obtained using
A. pitch time
B. work value
C. operations time
D. speed time
12. Convert eight (8) hours to hundreds of minutes.
A. 4800 hmn
B. 4800 hmn
C. 480 hmn
D. 480 000 hmn
13. Identify an abbreviation for theoretical time.
A. T_h
B. T_o
C. T_a
D. T_ta
14. State one aim of simplifying work measurement.
A. To identify work
B. To determine work load
C. To measure time and movements
D. To easily estimate time
15. The principal methods of measuring time in Clothing Industry is
A. Stop watch
B. Reference speed
C. Standard time
D. Instant observation
16. Classify operational stages of work.
A. Operations- working elements – phases – sub-phases
B. Phase- sub-phase – operations – working elements
C. Phase – sub-phase – working elements – operations
D. Working elements – operations – phases – sub-phases