SECTION A
- A Contractor won a contract to construct an administrative block of a hospital in a waterlogged site. Due to the high level of water, the site requires very good drainage. As a form five student on internship, you are expected to answer the following questions from your supervisor.
a) Define the following: (4 marks)
i) Drainage
ii) Drain
iii) Sewage
iv) Sewer
b) Differentiate between a septic tank and a cess pool (4 marks)
c) list two methods of site drainage (2 marks)
d) Sketch a septic tank and indicate the following parts: (10 marks)
i) Inspection chambers
ii) Inlet pipe
iii) Baffle plate
iv) Outlet
v) Sludge
vi) Effluent
vii) Scum
viii) Benching
ix) Cover
x) Air vent
- Building tools are the basic necessities for all construction sites. The construction of a bungalow has been entrusted to you by your supervisor. As a form five student what will be your technical know-how to the following questions.
a) Identify five tools used for the construction (5 marks)
b) Sketch a trowel and indicate the following parts (5 marks)
i) Handle
ii) Ferrul
iii) Shank
iv) Blade
v) Edge
c) Outline four procedures for checking the horizontal tube of a spirit level for accuracy (4 marks)
d) State three qualities of a building tool (3 marks)
e) Name three tools used in setting out (3 marks)
- A Company has been selected for the realization of a project for the construction of a G + 1 building for a residence in your locality. Answer the following questions:
a) State five factors that influence the design of a storey building (5 marks)
b) List five functions of a storey building (5 marks)
c) Outline four requirements of stairs (4 marks)
d) Enumerate four construction procedures of a concrete staircase (4 marks)
e) Name two means of access to an upper floor (2 marks)