PART ONE: DIRECT LEVELLING
Instruments: Surveyors’ level and its accessories
Field work: (20 minutes per candidate); (1.5 marks)

With reference to the permanent bench marks N1 and N2, the relative heights of the temporal bench marks, 1, 2, 3 and 4 are required. Leveling is to be carried out from four stations as highlighted on the sketch in figure 1 which has also been established in the field.

PART TWO: OPEN THEODOLITE TRAVERSE
Instruments: Theodolite or total station and its accessories
Field work: (30 minutes per candidate); (1.5 marks)

The coordinates of two points 1 and 2, of a closed theodolite traverse are required. The coordinates of the reference points A and B will be given by the members of the jury.

Collect the raw data required to determine the coordinates of these points.

PDF is loading please wait...


One comment on “cameroon gce A level digital processing and survey technology 3

Leave a comment

Your email address will not be published. Required fields are marked *

Download our application
kawlo
sponsors Ads