Give a name for work carried out in different
sections

A Multiple lines
B
Straight lines
C Lots
D Homogenous groups
Give another name for
a stop watch
A Chronmeter
B Clinometer
C Chronometer
D Chonometer
9.
Time in a workshop assembled on a table is
referred
to as
A Standard time
B Auxiliary time
C Reference time
D Equilibrium time
10
.
State an important factor in speed judgment
A Speed judgement
B Standard speed
C Accuracy
D
Reference speed
3. Select an abnormal value from the speed
measurement
A 110
B 220
C
120
D 115
State one method by which a worker can execute
a defined task
A Time convention
B
Time measurement
C Time calculation
D Strange time
11.
4. The control of work in a workshop is done with 12.
the aid of
A A watch
B A clock
C A stop watch
D A wall clock
Name one major function of the marketing
department
A Sales
B Forecast
C Production
D Designing
5
. Classify the different phases according to their
level of
intervention
A
Phases
, subphases, operation, working
element
B Subphases, phases, operation, working
element
C Operation
, working element, subphases,
phases
D Working element, phases, subphases,
operation
Give a name of work carried out before sewing
A Grading
B Preparation
C Cutting
D Drafting
13
.
14. Name the cause of low output in a pressing
workshop
A Delay during drafting
B Delay during grading
C Delay during cutting
Give the full meaning of Hmn D Delay during assembling
A Hundreds of times
B Hundreds of hours
C Hundreds of minutes
D Hundreds of seconds
6
.
15. The parts of a dress that is put together to form a
unit is called
A Elements
B
Products
C Sub assemble
D Assemble
7
. Identify the symbol below
> 16. State A the Layout last operation pattern on a mounting range
B Sew side seams
C
Top stitch all parts
D Iron finished article
A Storage
B Transport
C Operation
D
Control
The rhythm of producing a line is referred to as
A Fabrication
B
Production flow
C Change over time
D Manufacturing

 