cameroon gce intermediate level construction processes and building practice 1

cameroon gce intermediate level construction processes and building practice 1

cameroon gce intermediate level construction processes and building practice 1

1. Identify the type of pointing that is excellent for
external face work.

A Recessed pointing.
B Stuck pointing.
C Weather-stuck pointing.
D Rounded pointing.

 

2. Give the name of the type of mortar mixed with
more than one binder.

 

A Gauge mortar
B Lime mortar
C Cement mortar
D Lime-Cement mortar

 

3. Select the name of the horizontal poles in
scaffolds that connects the standards.

 

A Braces.
B Putlogs.
C Bridles.
D Ledgers.

 

4. Choose the name given to the vertical surface of a
step.

 

A Rise.
B Riser.
C Nosing.
D String.

 

5 Who of these personnel is responsible for the
setting out operations on the site ?

 

A Town Planner.
B Quantity Surveyor.
C Architect.
D Contractor.

 

6. Calculate the length of a right-angled triangle
having a width of 3m and a diagonal of 5m.

 

A 8m.
B 6m.
C 4m.
D 7m.

 

7. Define a Gable wall.

 

A A wall constructed to seal the ends of a
pitched roof.
B A wall constructed above the roof.
C A wall constructed to separate rooms.
D A wall constructed to separate dwellings

PDF is loading please wait...


Leave a comment

Your email address will not be published. Required fields are marked *

Download our application
kawlo
sponsors Ads