cameroon gce intermediate level manufacturing processes 3

cameroon gce intermediate level manufacturing processes 3

cameroon gce intermediate level manufacturing processes 3

WORK TO BE DONE
You are required to machine the piece in your workshop. The controls and machining by each candidate should go
through the following work posts:
1) Phase 10: (Post 100): Control of rough piece;
2)
Phase 20: Turning 1: (Post 200): Set and machine F1F, D1F, D2F, D3F and C1F;
3) Phase 30: Turning 2: (Pose 300): Set and machine F3F, D41F and C2F;
4) Phase 40: Drilling: (Pose 400): Set and machine A1F, A2F;
5) Phase 50: (Post 500): Final control of machined piece.

MARK DISTRIBUTION /30 marks
Dimensions obtained / Operations carried out Mark
Manipulation on machines /05 marks
Phase 20 /08 marks
Phase 30 /20 marks
Phase 40 /08 marks
Presentation of finished workpiece /05 marks

PDF is loading please wait...


Leave a comment

Your email address will not be published. Required fields are marked *

Download our application
kawlo
sponsors Ads