1. Identify a reformative action that is aimed at substituting a daily or yearly practice or method based on systematic reasoning and logic.
A Reformation
B Transformation
C Transition
D Rationalization
_____________________________________________
2. Describe the general acceptance of certain principles in construction or production as fundamentals
A Cordial norms
B Normalization
C Standardization
D Regularization
_____________________________________________
3. outline the quantitative relation between what we produce and the resources used in producing them
A Production rate
B Productivity
C Manufacturing
D Output
_____________________________________________
4. cite the art and science involving the movement, handling and storage of materials during different stages of manufacturing
A Stores management
B Material management
C Accounting department
D Material handling
_____________________________________________
5. Indicate the function of Conveyors, industrial trucks, cranes and hoist, containers, robots in the production system
A Transportation equipments
B Material handling equipments
C Displacement facilities
D Loaders
_____________________________________________
6. Select a type of layout where machines and auxiliary services are located according to the processing sequence of the product.
A Product layout
B Combination layout
C Process layout
D Group layout
_____________________________________________
7. Identify a factor that determine the space allocated for each machine in the shop
A The number of persons working on the machine
B The sizes of timber
C A space of at least 3m2
D The type of operation
_____________________________________________
8. Cite the comfortable assembly space per person in the workshop
A 1.5m2
B 2.0m2
C 2.5m2
D 3m2
_____________________________________________
9. Which of the following is a method of waste extraction system?
A Waste is being swept and carried by hand
B Waste is being collected by trashcans
C Waste is being sucked by air
D Waste is being collected by specialist
_____________________________________________
10. State why panels in a door are not glued during assembling
A Assembling would be more difficult
B Movement is needed within the frame
C Change may be required at later time
D For fear of craftsmanship